Revitalizing The Diamond

Phase 1: Backstop netting – A complete rebuild of the backstop and netting with the use of a new netting system that opens the sightlines for all spectators and better protects the neighborhood from foul balls. 

  • Completed by February 2024 

  • Estimated Cost: $60K 

Phase 2: New Dugouts with railing and equipment shed along the 3rd base line – A complete rebuild of the third base home dugout and attached equipment shed to house all field maintenance materials. Also, a new protective railing spanning the length of the dugout will be installed. 

  • Completed by January 2025 

  • Estimated Cost: TDB 

Phase 3: Create a new concession stand, new field entrance, renovate restrooms and press box, new connecting bleachers 

  • Completed by: TBD 

  • Estimated Cost: TBD 